Dear buyers of the "ARIA" residential complex. We inform you that all construction and installation works are underway:
1. Installation of a drain from the terraces of the 3rd floor of sec. #3,2. Laying pipes and their insulation.
2. Masonry of the walls of the 1st floor, section #3.
3. Installation of sewerage outside the building site (shaft).
4. Plastering of staircases, descent to the parking lot on section #1,2,3,4,5.
5. Construction of a concrete ramp and stairs on the side of Druzhba Narodov Boulevard within the 1st and 2nd sections.
6. Adjustment of entrance doors to apartments, section #1, 3-10 floors.
7. Arrangement of side stone (pavement, flower beds) in the yard of the house within section #5,4,3,2,1. Planning with crushed stone to the design mark in the yard of the house, the road and the sidewalk within the section #5,4,3,2,1.
Arrangement of the fem in the yard of the house, the road and the sidewalk within the boundaries of section #5,4,3,2,1. Arrangement of a fem at the entrance to the yard of the house with
sides of the street Czech
8. Installation of 0SВ plates at the entrance to the parking lot from the side of the street. Czech Within its 1st section. Installation of 0SВ plates at the entrance to the parking lot from Druzhba Narodiv Boulevard between the 2nd and 3rd sections.
9. Facade section #1
Installation of double-glazed windows, installation of metal brackets, installation of an aluminum frame, installation of abutment, installation of aluminum brackets under the frames, installation of aluminum brackets of NVF, installation of insulation of NVF, installation of aluminum guide of NVF.
10. Facade section #2
Installation of double-glazed windows, installation of metal brackets, installation of an aluminum frame, installation of abutment, installation of aluminum brackets under the frames, installation of aluminum brackets of NVF, installation of insulation of NVF, installation of aluminum guide of NVF.
11. Facade section #3
Installation of double-glazed windows, installation of metal brackets, installation of an aluminum frame, installation of abutment, installation of aluminum brackets under the frames, installation of aluminum brackets of NVF, installation of insulation of NVF, installation of aluminum guide of NVF.
12. Facade section #4
Installation of double-glazed windows, installation of metal brackets, installation of an aluminum frame, installation of abutment, installation of aluminum brackets under the frames, installation of aluminum brackets of NVF, installation of insulation of IIVF, installation of aluminum guide of NVF.
13. Facade section No. 5
Installation of double-glazed windows, installation of metal brackets, installation of an aluminum frame, installation of abutment, installation of aluminum brackets under the frames, installation of aluminum brackets of NVF, installation of insulation of NVF, installation of aluminum guide of NVF.